SEARCH

PEE-476A PARALLEL OPERATIONS OF TWO ALTERNATORS

SKU:PEE-476A

In Stock

PEE-476A PARALLEL OPERATIONS OF TWO ALTERNATORS

SCOPE OF LEARNING:
Study of Parallel Operations of Two Ac Alternator (Synchronizing the 2 Alternator)
Study of Operation of DC Shunt Motor
Study of Operation of 3Phase Synchronous Generation.
Study of Dark Lamp Method using Parallel Operations of Two Ac Alternator
Study of Bright Method using Parallel Operations of Two Ac Alternator

Compare

TECHNICAL SPECIFICATIONS:
Power Supplies:
DC Power Supply 0-230V AT 2A (Field Control) 2Nos.
DC Power Supply +230V AT 2A (Field Control) 2Nos.
Operated on Mains power 230V, 50Hz +10%
Digital/Analog Meters:
Voltmeter DC 2Nos.
Ammeter DC 4Nos.
Voltmeter AC 2Nos.
Ammeter AC 2Nos.
Synchroscope 1Nos.
RPM Meter 2Nos.
Multifunction Meter 2Nos.
Components are mounted on the panels are:
Three Phase Lamp Load Switched Control
Synchronizing Lines For Parallel Operations.
Output Through 4Pole MCB (For Alternators)
3 Point Starter 2Nos.
Color Indication For Output
Variac (For Field Control Power Supply) 2Nos.
SALIENT FEATURES:
Voltage regulation within limit as per ISS.
Special guard also provided on the coupling to avoid any mis-happening during operation.
D.C. Motor Shunt 2HP coupled with A.C. Alternator
1KVA (Separately or self Excited.
Front panel built with high class insulated Bakelite sheet with Sticker well printed circuits and symbols.
Instruction manual.
Patch Cords 4mm (Heavy Duty) 1Meter Length.
High Voltage Test Points are Provided With 4mm Safety Sockets
The trainer is housed in Metal cabinet.
Short Circuit protection with the MCB.
Size of the trainer set 65”x24”
OPTIONAL ACCESSORIES:
No
SCOPE OF SUPPLY:
DC Motor 2HP, 230V and AC Synchronous Alternator (1KW). (2Nos.)
Synchronizing of Two Alternators Control Panel (1Nos.)

Back to Top